New Zealand law provides that all commercial vessels must go into an approved survey plan for the safety of the vessel, crew and the public.

A survey plan is a key component of your MOSS (Maritime Operator Safety System)

Operator Plan.

Under MOSS, every ship needs to be surveyed:  any time between 24 and 36 months from the date the Certificate of Survey was issued, and within the six months before the Certificate of Survey expires

Call Battery Town Marine for more information and connect with approved an approved surveyor and design approver  - 0800 962 288
 

Maritime NZ Electrical Survey & Electrical Design Approval